Four ways to work together

Engagements

Each one starts from the same place: what your records say against what your floor does.

I · Three weeks, fixed pricefrom USD 8,500

Diagnostic Field Audit

For stock that does not reconcile, write-offs nobody can explain, or a deployment that has stalled.

  • Week one, the records or the floor. Starts offline on a static five-column export (case, activity, timestamp, who, where) with zero network access, or on the floor by video or on site across every shift.
  • Week two, loopholes and incentives. Cross-check the records against the shifts for control loopholes, shared logins, bypass paths, and floor KPIs or bonuses that pay for shortcuts.
  • Week three, the baseline and the list. Every loss in the order of what it costs, with the count and the arithmetic shown on pages you can forward, and a 30-60-90-day plan, presented to whoever signs.

Paid 50% at the start and 50% on delivery. On-site days are billed separately. Your team keeps the count sheets and the queries.

Enquire

II · Through go-live, project feefrom USD 15,000

Deployment & Cutover Leadership

For a WMS, ERP, hotel, farm or AI system going live where a bad start stops dispatch or service.

  • Data staged and checked before anything writes to production, including a pre-go-live adversarial check against malformed records, overly broad permissions and untrusted AI inputs, with a way back.
  • Floor KPIs and bonus rules audited and tested against bypass behaviour before go-live, so the incentive does not pay the crew to route around the system.
  • Step-by-step instruction on the floor, in the crew’s own terms.
  • Go-live and hypercare on the floor, until the old shortcuts die.

Paid 30% at the start, 40% at go-live and 30% when the agreed measures hold 30 days later.

Enquire

III · Retainer, fifteen to twenty hours a weekfrom USD 6,000 per month

Fractional Operations / Deployment Lead

For a team that needs a senior operations or deployment lead for 15 to 20 hours a week: stock accuracy and shrink, the flow from purchasing to the warehouse, and the deployment calendar, with two or three working sessions a week with your leadership.

Enquire

IV · By the hour, or on your floorUSD 250 per hour

Advisory & Operational Due Diligence

For boards and investors: 60-minute sessions, or a short review of the data before a decision.

Enquire

On-site days

USD 1,200 per day, plus travel at cost

Data analysis, diagnostic tooling and specification work run remotely from Chile. On-site days cover floor walks, blind counts and leadership alignment under standard business-visitor rules. How travel works.

After the work

90 days

The 90-day check is included. Ninety days after an audit or go-live, we check by video whether it held: your team re-counts the same sample, or we run the 90-day check on who still uses the system, who went around it, and why.

No fee

If it did not hold, putting it back is on me. The work to bring the agreed measures back carries no fee; travel, if it is needed, is at cost. Measures are agreed in writing before we start.

20% less

Coming back costs less. For 12 months after an engagement ends, advisory hours and on-site days cost 20% less.

Who to hire for what

Not everything is a job for me. If you need one of the first three, hire them; I work alongside all of them.

Who Hire them when What they leave
A large consulting firm The programme spans many sites and the board wants a well-known name behind it. A team whose members can change along the way, a report and a plan.
Your auditor You need an opinion on whether the accounts are right. An opinion. Independence rules limit what an auditor may fix for a client it audits.
Your system integrator The system has to be installed and configured. An installed system.
Me One operation loses money between the record and the floor, or a system goes live and the orders still have to ship. The baseline, the list of losses, the fix at its cause, and the method in the hands of your team.
In ten rollout roles at software vendors, the system is always in scope and adoption is in seven of them. Checking the record before it is used is in two, a test stage before the write is in two, and the incentive is in none.
The riskOne implementation role at a software vendorOne deployment strategist role at a software vendorMy cutover engagement
The system is not installed, configured and supportedAnswered for it in a live operationAnswered for it in a live operationDescribed
The record was already wrongNot in scopeNot in scopeBuilt and tested outside a live system
The system is set up for the manual, not the floorNot in scopeAnswered for it in a live operationAnswered for it in a live operation
The incentive pays for the wrong thingNot in scopeNot in scopeBuilt and tested outside a live system
A bad number writes straight to the live systemNot in scopeNot in scopeBuilt and tested outside a live system
Nobody owns it after go-liveAnswered for it in a live operationAnswered for it in a live operationAnswered for it in a live operation
The cash and the return never reach the P&LNot in scopeAnswered for it in a live operationDescribed

Coded from ten job postings on startup.jobs published in the two weeks before 15 November 2026: five implementation roles and five deployment strategist roles at software vendors whose customers run physical operations, read with the same rules as my own engagement. Each cell is the middle of five roles; a column is one kind of role, not a whole team.

Want the full fourteen-axis view against forward deployed engineers, implementation and customer success?

Open the fourteen-axis radar

Best fit

An operation with its own floor (a farm, a plant, a kitchen or a warehouse) and revenue between USD 10M and USD 100M, or a technology team deploying into one; a system change in the last or next 12 months; and an executive who signs. The entry point is the field audit.

Roles I can cover
  • Deployment Strategist. For applied-AI, robotics, AgTech and food-tech teams: turn a pilot into a deployment the floor keeps using. Fractional lead or cutover leadership.
  • Head of AI Adoption. For companies with software bought but underused: retire the parallel spreadsheets and align the incentives with the system. Fractional lead, three to six months.
  • Implementation Lead. For WMS, ERP, farm and hospitality software vendors: run go-lives on site without burning the services margin. Cutover leadership or fractional lead.
  • Fractional Head of Operations. For farms, restaurant and hotel groups, distributors and e-commerce businesses: own purchasing, logistics, shrink and inventory without the fixed cost of a full-time executive. Fractional lead.
  • Inventory and Supply Chain Strategist. For meat processors, importers, food-service distributors and multichannel retailers: free cash held in stock, tighten yield and food cost, and cut stockouts. Field audit or fractional lead.
  • WMS / ERP Cutover Manager. For operations moving their core system: close the old system and open the new one without stopping dispatch. Cutover leadership.
  • Operating Advisor. For private equity, search funds and investment firms: check the floor, the cold rooms, the warehouses and the systems before an acquisition. Advisory or field audit.

Tell me what you’re seeing